Projects



Current Capital Projects in 2024

Installation and upgrade of (19) fuel stations at various locations in the Kingdom.

 Construction of new LPG storage facilities (10000 ton capacity) in Zarka site at cost of JD (33) Million.

Construction of new LPG storage facilities (4000 ton capacity) at Aqaba site at cost of JD (15) Million.

Construction of new base oil storage facilities at Aqaba site at cost of JD (2.5) Million.

 Installing a solar energy system for the Amman and Salah al-Din-Irbid gas filling stations at an estimated cost of JD (1.1) million.

 Modifications on fire fighting and alarm systems in Aqaba installations at cost of (800) thousands JD.

Supply of (7) pumps to replace existing pumps in refinery units at cost of JD (700) thousands.

 Purchasing a fire fighting vehicle at a cost of JD (400) thousands

 Apply passive protection system for steel structure in Unibon and hydrogen units at cost of JD (400) thousands.

Supply of special valves for LPG storage tanks at Aqaba site at cost of JD (250) thousands.

 Supply of (4) forklifts for LPG filling stations at cost of JD (232) thousands.

 Supply of (2) vessels to replace existing vessels in FCC unit at cost of JD (200) thousands.

 Supply of (3) Reduced Crude pumps for CDU-3 unit at a cost of JD (150) thousands.

 Supply of (4) testing equipment for refinery units at cost of JD (110) thousands.

Supply of (2) instrument air compressors for LPG facilities at cost of JD (100) thousands .

 Replacement of electric panels at cost of JD (90) thousands.

 Supply of Gas humidity measuring device for Platforming unit/Area 6 at a cost of JD (60) thousands.

 Supply of (12) portable huts for refinery units at cost of JD (40) thousands.

 Supply of new AVGAS pump to replace existing one in Amman civil airport at cost of JD (20) thousands.