The most important capital projects that have been completed during the year 2025:

Construction and upgrading of (15) fuel stations in various locations across the Kingdom, and installation of
(110) electric vehicle charging stations at the company's own and other locations throughout the Kingdom. 

Replacement of the main servers for the company's core computer systems at the primary and backup sites at
a cost of approximately JD (1,5) million.

Modifications to the fire alarm and extinguishing systems at the South Aqaba facilities at a cost of approximately
JD (900,000).

Purchase of a Backup Router for the FCC unit at a cost of approximately JD (800,000).

Supply of seven pumps to replace existing pumps in the refining units at a cost of approximately JD (700,000).

Upgrading a section of the firefighting system network at the company's Zarqa site at a cost of approximately
JD (600,000).

Upgrading and rehabilitating the crude oil loading system at the Aqaba storage facilities at a cost of
approximately JD (600,000). 

Installation of a solar power system for the Salah Al-Din Gas Station in Irbid at a cost of approximately JD
(500,000).

Installation and commissioning of a tank flood prevention system at the company's Aqaba site at a cost of
approximately JD (500,000). 

Purchase of a fire and rapid intervention vehicle for the company's Aqaba site at a cost of approximately JD
(400,000). 

 Replacement of (11) main filters at Queen Alia International Airport at a cost of approximately JD (350,000). 

Installation of solar-powered electricity generation systems at the Aqaba Stores at a cost of approximately JD
(250,000).

 Supply of two new pressure vessels to replace the existing pressure vessels at the FCC unit at a cost of
approximatelyJD (200,000). 

Upgrading the turbine shaft for the TG3 generator at a cost of approximately JD (200,000). 

 Design, supply, installation, commissioning, and calibration of (2) PITLESS electronic scales with a capacity of
(100) tons at the company's site in Zarqa at a cost of approximately JD (170,000). 

Construction of storage facilities for mineral oils at a cost of approximately JD (150,000).

 Detailed design study for a project to utilize treated wastewater from the industrial wastewater treatment unit
at the Al-Samra power plant at a cost of approximately JD (150,000). 

 Purchase of UPS systems (Parallel System) for the Area 6 units and Unibon Unit at a cost of approximately JD
(120,000). 

Fabrication of a distillation tower and vessels for the Crude Distillation Unit No. 1 at a cost of approximately JD
(100,000). 

Supply of a hydrostatic testing machine for LPG cylinders at a cost of approximately JD (100,000).

Supply of three diesel-powered air compressors at a cost of approximately JD (96,000).

Supply of Valves Testing Machine for testing of safety and shut-off valves for use in the Valves Workshop at a
cost of approximately JD (95,000).

Installation of a fire extinguishing system at King Hussein International Airport and Amman Civil Airport at a
cost of approximately JD (80,000).